Joined
·
80 Posts
Hey everyone, been working on the bike a little here and there for the past week so I thought I’d share. Started off with the intention of just removing the evap canister and sending the ECU off for a reflash, but that quickly changed.
I had a few things sitting around I’ve been waiting to install so I decided what better time than now?!
XSR900 bars
Koso Apollo heated grips
wired into the auxiliary connector
Horn relocation
Waiting on a package with blockoff plates to finish up here
Next I’m going to be mounting these LED pods, I’ll probably do a more detailed install so pictures to come!
I had a few things sitting around I’ve been waiting to install so I decided what better time than now?!
XSR900 bars
Koso Apollo heated grips
wired into the auxiliary connector
Horn relocation
Waiting on a package with blockoff plates to finish up here
Next I’m going to be mounting these LED pods, I’ll probably do a more detailed install so pictures to come!